Supreme Infra – Commencement of Tolling operations for Patiala Nabha Malerkotla (PNM) Road Project

July 4, 2012

Supreme Infrastructure India Ltd has informed BSE that the Company”s subsidiary Supreme Infra Projects Private Limited (SIPPL) has completed the construction of the Patiala Nabha Malerkotla(PNM) Road project on a DBFOT basis. The Company has commenced tolling operations on June 24, 2012. The Project was awarded by Punjab Industrial Development Board (PIDB) and in August 2011 was taken over by SIPPL from the original concessionaire. The sixe or this project was Rs. 94 cr. The concession period is 13.5 years. The total length of the road is approximately 56 kms. The EPC work was executed by Supreme Infrastructure India Ltd.

With this, the Company has achieved operational status of its 2nd Road BOT Project in India and its 1st Road BOT project in Punjab outside Maharashtra.

SOURCE:http://www.moneycontrol.com

10 Comments on “Supreme Infra – Commencement of Tolling operations for Patiala Nabha Malerkotla (PNM) Road Project” Post your comment

  1. Chandra Sekhar on July 17th, 2012 4:39 pm

    We are manufacturers of Servo Controlled Voltage Stabilizers, APFC Panels, Power Savers, Street Lighting Controllers for Highway Lighting applications since last 31 years. We are supplying this products to GMR Infra, Punj Lloyd etc.

    For your road projects it may require this product.

    Pl. send us your requirements

  2. RAM GOPAL TATHGIR on February 27th, 2013 10:56 am

    The patiala nabha toll charges are not as per norms of govt of India. There is no multiple entry allowed. also the toll ends in night at11.59.59 that means the person passing through the toll at11.50 can not have to and fro ticket. The toll is allowed throughout the country for a period of 24 hours and multiple entry is allowed with in that period.

  3. Atul yadav on March 4th, 2013 8:36 pm

    Sir i want work in your company i compleet my graduation with BCA present time i work in IRB company as a shift incharge please if any requirment in your company . Mail or call 8421018789 Atul yadav

  4. Workers Injury Lawyers Reseda on March 12th, 2013 8:40 am

    You really make it seem so easy with your presentation but I find this matter to
    be actually something which I think I would never understand.
    It seems too complex and very broad for me. I’m looking forward for your next post, I will try to get the hang of it!

  5. Immigration Advice Hillingdon on March 12th, 2013 9:04 am

    Wow, this piece of writing is fastidious, my sister is analyzing such things, therefore I am going to tell her.

  6. Tier 2 Visa on March 12th, 2013 9:22 am

    It’s perfect time to make some plans for the future and it’s time to be happy.
    I’ve read this post and if I could I wish to suggest you some interesting things or suggestions. Perhaps you can write next articles referring to this article. I wish to read more things about it!

  7. Kuldeep Singh on June 28th, 2013 1:22 pm

    Sir i want work in your company. I have done the diploma in Computer Science & Engineering and done the degree in Electrical Engineering. I have more than one year Experience. Presently,I am working in Capital Power Infrastructure Ltd. as a SITE ENGINEER. If you have Job Related requirement, please send us your requirements. I shall be so thankful to you.

  8. Sandip khairnar on October 4th, 2015 6:31 pm

    Dear sir,i want to work in your company,that is operator etc.i have complete 12th science with mscit.then job available com.operator pls call me 9665343166.

  9. Sukhbir singh on July 31st, 2016 4:05 pm

    I m living in Nabha. Supreme infra Toll company is not maintaining speed breakers on the chownks in Nabha . Like in Nabha, Ranjeet nagar chownk near Bus stand from last 1 year there is no maintenance of speed breakers by SUPREME INFRA. It is very crowdy chownk. Heavy traffic passes on very high speed due to non maintenance of speed breakers .Therefore I request u to built or maintain the speed breakers on priority bases .

  10. N K SINGLA on September 1st, 2016 8:51 am

    THE UNDERSIGNED IS A AUTHORISED MANAGEMENT OFFICIAL OF MAYA DEVI GOYAl PUBLIC SCHOOL AHMEDGARH .IT IS RUN BY A CHARITABLE TRUST & AFFILATED TO CBSE- & NON AIDED. OUR SCHOOL VAN ARE PLYING IN THE RADIOUS OF 10-15 KM FROM TOLL PLAZA AT LUDH-MALERKOTLA ROAD.

    IS THERE MONTHLY PASS FACILITY IS AVAILABLE TO THE SCHOOL VANS. IF YES TO WHOM WE HAVE TO CONTACT.
    IT IS LEARNT THAT CONCESSIONARY PASS FOR Rs. 1000/- PM IS ALLOWED AS PER NAHAI RULES.

    REGARDS
    N K SINGLA , MBL. 98156 54631

Share your comments here: