Six-laning work of NH45 begins

July 15, 2014

Over 90,000 vehicles use the stretch connecting Tambaram and Tindivanam. Photo: M. Srinath
Over 90,000 vehicles use the stretch connecting Tambaram and Tindivanam.

Preparatory work has commenced for the six-laning of a 93-km stretch on the Chennai-Tiruchi highway (NH45) from Tambaram to Tindivanam.

According to sources in the National Highways Authority of India (NHAI), the consultant has begun preparing the land plan schedule that identifies government and private lands. The consultant is also drawing up the estimate for shifting of utilities along the road that is used by over 90,000 vehicles a day.

The process including enumeration of trees along the road will take two years. “Since the concessionaire has a contract to build, operate and transfer the road for a period of 17.5 years, which is till November 2019, the NHAI will take a call as to when the work can be taken up,” explained an official. Work to widen the road into a four-lane facility began in May 2002 and was completed in October 2004 when tolling began.

A decision will also be taken regarding widening of the urban stretches upto Tambaram. “We have to take into consideration various factors including the Chennai Outer Ring Road that takes off from Vandalur, the railway track running on one side of the road and the densely populated urban stretch. Land acquisition will be a major issue in these areas,” he said.

R. Samban, who recently travelled by the NH45 to Tiruchi, said that the lighting could be improved on some stretches. “Some of the curves are quite sharp. During the widening, care must be taken to improve visibility at these points. The NHAI must also ensure that trees along the road are not cut but transplanted,” he said.

Sources:The Hindu

Share your comments here: